Markets We Serve

OUR projects

Building for Every Industry

At Thayer-Bray Construction, we bring top-tier craftsmanship, innovative solutions, and industry-specific expertise to a wide range of markets. Whether it’s commercial, residential, industrial, multifamily, or institutional projects, we are committed to delivering high-quality results that meet the unique demands of each sector. No matter the scale or complexity, we build with precision, efficiency, and a focus on long-term value.

Partner with us today

At Thayer-Bray Construction, we serve a diverse range of markets with precision, integrity, and unmatched craftsmanship. We understand that each market has unique challenges, and we tailor our approach to deliver results that stand the test of time.

Partner with us today

At Thayer-Bray Construction, we serve a diverse range of markets with precision, integrity, and unmatched craftsmanship. We understand that each market has unique challenges, and we tailor our approach to deliver results that stand the test of time.

SpartanNash

Midland, ga

Completion Date

March 1, 2021

Description

This was a new maintenance facility for an existing trucking terminal. The building was a pre-engineered metal building structure with CMU walls. The facility had three drive through bays with lifts for diesel truck maintenance. It also included a full truck wash bay. Full hvac and plumbing included exhaust for the bays, a full air supply system and oil and grease line supplies.

Key Details

  1. Project was finished before contract end date
  2. Project included extensive site work within a fully operational trucking terminal
  3. Thayer-Bray coordinated with many owner furnished maintenance related equipment

Photos

Brookstone School Cheves

Columbus, GA

Completion Date

April 18, 2018

Description

Construction of a new 8,900 square-foot athletic support facility. The building included new boy’s and girl’s locker rooms, restrooms and showers, athletic storage space, concessions area, and Hall of Fame gallery. Construction consisted of wood roof trusses on load-bearing masonry with a standing seam metal roof system.

Key Details

  1. Construction consisted of wood roof trusses on load-bearing masonry with a standing seam metal roof system.
  2. This building was constructed while school was in session, and access to adjacent athletic spaces transitioned through the construction area.
  3. We maintained barricaded, safe passageways for students and staff at all times.
  4. This project was completed on time and within budget.

Photos

Brookstone Tennis Facility

Columbus, GA

Completion Date

February 28, 2017

Description

This project consisted of the construction of a new premier tennis facility for Brookstone School. The three-acre site consists of nine practice courts and one main court. Each practice court has elevated seating and bleachers for spectator seating. The main court has terraced seating with Zeon Zoysia for spectator seating. Integral to the project is the walk of honor to memorialize previous tennis players, coaches, and families.

Key Details

  1. Construction of 10 new tennis courts
  2. Elevated seating/ Bleachers for each practice court
  3. Terraced Seating for main court
  4. Walk Of Honor created to memorialize former tennis players and coaches.

Photos

MCSD Weigh Room Expansions

Columbus, GA

Completion Date

September 1, 2022

Description

This project consisted of the expansion of weight rooms at three different locations for the Muscogee County School District. This location included sitework and landscaping. The buildings included a steel structure roof supported by masonry walls. The exterior includes brick veneer with aluminum window frames. Interior construction included upgrades to the HVAC systems along with updated LED lighting. Each location also included new rubber flooring to support the constant wear that comes with weight training.

Key Details

  1. Each location was completed within the school year as carefully as possible due to student activity in and around the construction sites.
  2. All locations were completed on or before schedule and well under budgeted cost.

Photos

St. Anne's Preschool

Photos

Central High School CTE Annex

Photos

Columbus Technical College Culinary Arts Facility

Columbus, GA

Completion Date

December 6, 2023

Description

Project consisted of the demolition of existing 8,800 sf of classroom interior spaces to construct a new Culinary Arts Facility. The new facility included dining area, teaching classroom, baking kitchen, and main kitchen. Finishes included epoxy floors, LVP flooring, carpet, FRP panels, and acoustical ceilings.

Key Details

  1. This building was constructed while school was in session.
  2. We maintained barricaded, safe passageways for students and staff at all times.

Photos

Westville

Photos

Starrett-Bytewise Development, Inc.

Photos

The Pastoral Institute

Photos

1602 3rd ave

Photos

1516 High Uptown apartments

Photos

1531 3rd Ave

Photos

1535 3rd ave

Photos

NIM Gold Star Memorial

Photos

NIM Korean Wall Memorial

Photos

Valley Rescue Mission Outparcel

Photos

D.A Turner YMCA Addition and Remodel

Photos

easter seals

Photos

Feeding The Valley

Photos

St. Nicholas

Photos

St. Paul

Photos